Featured Build: Andy’s Shëd

Director of East Yorkshire Gas ltd Andy Mason got in touch yesterday via twitter with a picture of his shëd…


…After a little gentle prodding Andy sent over what turns out to be a great gallery of build photos, including an inspection by two tough looking building inspectors…

Laying the plinth

Postholders in and frame in place

Postholders in and frame in place


 
Hardcore laid to the base

Hardcore laid to the base


 
Concrete poured

Concrete poured


 
and wait...

and wait…


 

Framing the walls & roof

Post Henge

Post Henge


 
Doors & Roof trusses in

Doors & Roof trusses in


 
There's a man happy at work

There’s a man happy at work


 
Andy went for a simple stud wall construction

Andy went for a simple stud wall construction


 

Cladding & boarding up

Interior stud work

Interior stud work


 
MMMMMM cosy

MMMMMM cosy


 
cabling up and boarding

cabling up and boarding


 
boarded up & "first fix" electrics in

boarded up & “first fix” electrics in


 
plastered

plastered


 
Cladding going on nicely

Cladding going on nicely


 

The finished article

the finished article

the finished article


 
Good sized office

Good sized office


 
nice clean roof.

nice clean roof.


 
A nice utility room forms the "shed half" - remember to rate the cabling if you're planning on fitting a high powered item like a tumble drier.

A nice utility room forms the “shed half” – remember to rate the cabling if you’re planning on fitting a high powered item like a tumble drier.

The building inspection

The building passed a rigorous inspection from Andys twin daughters

The building passed a rigorous inspection from Andy’s twin daughters

Leave a Reply

This entry was posted on Sunday, October 26th, 2014 at 7:39 pm and is filed under Uncategorized. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.